Skip to main content
Back to Blog
CAFC-PTONovember 25, 202625-1715Affirmed.

Centripetal Networks, LLC v. Keysight Technologies, Inc.

Patent Trial and Appeal Board

Holding

The Federal Circuit affirmed the Board's final written decision in IPR2022-01421 holding all claims (1-30) of the '009 patent unpatentable as obvious. It upheld the Board's construction of "caching," found no APA violation, and found substantial evidence for the Board's findings on Hayter and Roese.

Why It Matters

The decision shows how deferential substantial-evidence review is to the Board's reading of prior art, and that a non-substantive paraphrase of an agreed construction in a final written decision does not create an APA notice problem. The court did not reach Keysight's alternative collateral estoppel ground.

Key Points

  • The '009 patent claims "fast rule swapping" for network protection devices such as firewalls. Claim 1 requires preprocessing both rule sets before implementation, then caching packets in response to a swap signal. Dependent claims 2, 15, and 19 add that the second rule set is received after implementation of the first.
  • Claim construction: the court rejected Centripetal's argument that "caching" must occur only while rules are being swapped. The claims already sequence caching after the signal and after ceasing packet processing, and Figure 4 confirms that sequence without adding a further timing limit.
  • Hayter: substantial evidence supported the finding that Hayter teaches caching entire data packets, based on its claim 9 (the entire header plus at least one byte of payload) and its teaching that some packets have no payload. The court did not reach the alternative Hayter-Roese combination.
  • Roese: there was no APA violation because the Board's final-decision wording of "being implemented" was an immaterial paraphrase of its institution-stage construction. Substantial evidence also supported the finding that Roese's "pre-installed" rule sets are not implemented and can be preprocessed at any time, including before implementation.
  • Dependent claims 2, 15, and 19: Centripetal's argument depended on equating pre-installation with receipt, which the court rejected. Roese's expansive timing disclosure supports the Board's finding that the claims are obvious.
§ 103claim constructionwaiver / forfeiturenon-precedentialclaim preclusion

How this summary was made: Drafted with AI from the court's opinion or order; before publishing, code checked that the quotation and the citations it gives appear in that document. Editorial policy

Other decisions in this case

More on this topic

New to Patent prosecution? Start with MPEP 2143: Obviousness Under 35 U.S.C. 103 and the KSR Rationales